Optimalisasi Jangka Menengah PLTA Memperhatikan Ketersediaan Air Menggunakan Linear Programming

  • Winasis Universitas Jenderal Soedirman
  • Hari Prasetijo Universitas Jenderal Soedirman
  • Giri Angga Setia Universitas Jenderal Soedirman
Keywords: optimalisasi, jangka menengah, ketersediaan air, PLTA, Linear Programming

Abstract

Hydro power plant is kind of electric power generation which utilize energy from water fall to produce electricity. One of its operational problem is limited water supply and available water which can be stored in reservoir. This limitation will affect the electrical energy can be generated by the hydro power plant. This paper present a methodology of medium term optimization of hydro power plant operation to maximize its energy production with considering water availability in reservoir as operational constraint. Operation optimization problem is formulated in Linear Programming model and then solved using Tomlab optimization software. Simulations using water flow data of Ketenger Hydro Power Plant on June 2013 show that this method can be used to solve hydro power plant operation optimization problem well. Based on the simulation results with a period of 720 hours (1 month) the total electrical energy that can be generated is equal to 2990.8 MWh. This value is 69,6 MWh (or 2,3%) greater when compared to the real condition of electrical power generated in June with ammount of 2921,2 MWh.

References

Wood, Alen J., Wollernberg Bruce F., 1996. Power Generation Operation And Control. John Wiley & Sons.)

Pratama, Sezar Yudo. 2011. Studi Operasional Waduk Sengguruh untuk Pembangkit Listrik Tenaga Air. Tesis Program Pascasarjana. Institut Teknologi Sepuluh November. Surabaya.

Cheng, C.T. Wang W.C., Xu D.M. and Chau K.W. 2008. Optimizing hydropower reservoir operation using hybrid genetic algorithm and chaos. Water Resources Management, 22 (7): 895-909.

Asfaw, Tilahun Derib and Hashim, Ahmad Mustafa, 2011. Reservoir Operation Analysis Aimed to Optimize the Capacity Factor of Hydroelectric Power Generation. International Conference on Environment and Industrial Innovation IPCBEE vol.12 (2011), Singapore.

Jothiprakash V., Arunkumar R.. 2013 Optimization of Hydropower Reservoir Using Evolutionary Algorithms Coupled with Chaos. Water Resources Management, Volume 27, Issue 7, pp 1963-1979 May 2013.

Ghimirea, Bhola N.S. & Reddya, M.Janga. 2013. Optimal Reservoir Operation for Hydropower Production Using Particle Swarm Optimization and Sustainability Analysis of Hydropower. ISH Journal of Hydraulic Engineering Volume 19, Issue 3, 2013 pages 196-210.

Catalao,J.P.S., Mariano, S.J.P.S. Mendes, V.M.F and Ferreira, L.A.F.M. 2008. Nonlinear optimization method for short-term hydro scheduling considering head-dependency. European Transactions On Electrical Power (2008)

Tarigan, Abinentaras. 2001. Optimasi Pemanfaatan Air Waduk Kedung Ombo dengan Program Linier. Tesis Program Pascasarjana. Universitas Diponegoro. Semarang.

How to Cite
Winasis, Hari Prasetijo, & Giri Angga Setia. (1). Optimalisasi Jangka Menengah PLTA Memperhatikan Ketersediaan Air Menggunakan Linear Programming. Jurnal Nasional Teknik Elektro Dan Teknologi Informasi, 3(2), 152-156. Retrieved from https://dev.journal.ugm.ac.id/v3/JNTETI/article/view/3085
Section