KONTRIBUSI PENGINDERAAN JAUH UNTUK PENGEMBANGAN SISTEM PEMANTAUAN PEMANFAATAN RUANG PADA RENCANA TATA RUANG WILAYAH

https://doi.org/10.22146/mgi.13328

Panji Agung(1*), Mohammad Pramono Hadi(2), Sigit Heru Mukti(3)

(1) Bappeda Kabupaten Bulungan
(2) Fakultas Geografi, Universitas Gadjah Mada, Yogyakarta
(3) Fakultas Geografi, Universitas Gadjah Mada, Yogyakarta
(*) Corresponding Author

Abstract


ABSTRAK Dampak nyata dari gema Undang-Undang otonomi daerah adalah meningkatnya aktifitas ekonomi di sektor konstruksi yang turut mendorong terjadinya pelanggaran terhadap rencana pemanfaatan ruang pada rencana umum tata ruang di daerah, untuk itu sudah saatnya dilakukan upaya pengendalian dan pengawasan secara terus menerus dan terintegrasi terhadap pelaksanaan rencana pemanfaatan ruang pada RTRW Kabupaten, agar tidak terjadinya dampak-dampak yang tidak diinginkan. Langkah kongkrit mewujudkan hal tersebut perlu dibangun suatu sistem pemantauan yang sederhana cepat dan murah yang merupakan bagian upaya pengendalian dan pengawasan sehingga dapat digunakan oleh pihak yang berkecimpung dalam perencanaan dan pengendalian RTRW setiap saat. Pelaksanaan pengembangan sistem pemantauan pemanfaatan ruang ini menjadikan Kabupaten Sleman sebagai lokasi penelitian. Penelitian dilakukan dengan menggunakan citra TERRA/ASTER rekaman tahun 2007 untuk memperoleh data primer  penggunaan lahan hasil interpretasi langsung dari citra satelit. Sedangkan data sekunder berupa peta pemanfaatan ruang diperoleh dari hasil digitasi peta pemanfaatan ruang RTRW Kabup aten Sleman. Kedua data tersebut selanjutnya dioverlay yaitu proses yang merupakan perwujudan dari proses pemantauan pemanfaat ruang dalam suatu RTRW kabupaten, dalam proses tersebut peta penggunaan lahan hasil dari interpretasi citra Aster berfungsi sebagai parameter pemantau dan peta pemanfaatan ruang berfungsi sebagai obyek yang dipantau. Sistem yang terbangun dalam penelitian ini terdiri dari beberapa subsistem langkah­langkah pengelolaan data citra ASTER dan peta rencana pemanfaatan ruang pada RTRW Kabupaten. Sistem tersebut terdiri dari subsistem persiapan, input, proses, analisis, dan output. Hasil pemantauan pemanfaatan ruang pada lokasi dengan menggunakan sistem pemantauan pemanfaatan ruang, memberi gambaran bahwa di Kabupaten Sleman terjadi pelanggaran terhadap rencana pemanfaatan ruang untuk kawasan pertanian lahan basah sebesar 34%, untuk pertanian lahan kering sebesar 17%, untuk hutan perkebunan sebesar 12%. Kontribusi dari penginderaan jauh adalah memberikan kelebihan pada sistem pemantauan yang dikembangkan berupa dapat digunakan oleh aparat pemerintah setiap saat baik terjadi ataupun tidak terjadi pelanggaran pemanfaatan ruang, disamping peghematan waktu, keakuratan data dan jalur birokrasi yang tidak panjang serta biaya yang relatif murah.

 

ABSTRACT The real effect from sound of regional autonomy is the increasing of economic activities, especially in contruction sector in which follow pushing infringement space utilization plan on Local Spatial Arrangement Plans. For the reason, it is necessary required a continous and integrated development control to the plan implementation at local level, in order to prevent of undesirable impacts. A concrete effort to realize aforementioned purpose is to develop a simple and  cost-effective controlling and monitoring system as part of control and observation effort to Local Spatial Arrangement Plans enforcement, so that it can be used at any time by institution with planning and controlling authority. Execution the development of controlling and monitoring space utilization plan system became the Regency Sleman as research location. This research was conducted by using TERRA/ASTER imagery which recorded at 2007 to obtain primary data of land use as a result form satelite imagery interpretation. While secondary data is space utilization plan  map which obtained from Sleman space utilization plan map digitations. Both of data were  compiled with others through overlay procces as an implementation from development control of space utilization plan on local  spatial plans. On that process, existing land use map as a result from satelite imagery interpretation owning function as a monitoring parameter, while the land use map was stipulated as a watched object. As a result, this research  have yielded a controlling and monitoring system that consist of some subsystems which is step by step on ASTER imagery data management and space utilization plan map. Such subsystem are including preparation, input, processes, analysis and output. The observation result  of implementation in Regency Sleman by using the controlling and monitoring space utilization plan system which have been made by compiling of ASTER imagery processes and Space Utilization Plan map, prove that in Regency Sleman was happened infringement on space utilization plan for agriculture areas are equal to 34%, for dry agriculture areas equal 17%, and equal 12% for plantation areas. Contribution of remote sensing can be used at any time by implementation, beside another benefit like : cost-effective, time economizing, and cutting off bureaucracy path.


Keywords


ASTER; pemanfaatan ruang; pemantauan; penggunaan lahan; RTRW Kabupaten; ASTER; Space Utilization Plan; Monitoring; Land Use; Local Spatial Arrangement Plans




DOI: https://doi.org/10.22146/mgi.13328

Article Metrics

Abstract views : 9811 | views : 9099

Refbacks

  • There are currently no refbacks.




Copyright (c) 2016 Majalah Geografi Indonesia

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.


 

Accredited Journal, Based on Decree of the Minister of Research, Technology and Higher Education, Republic of Indonesia Number 164/E/KPT/2021

Volume 35 No 2 the Year 2021 for Volume 39 No 1 the Year 2025

ISSN  0215-1790 (print) ISSN 2540-945X  (online)

 

website statistics Statistik MGI