Improved Power Plant Performance Utilizing Hybrid Performance Test Execution (HYPER-X)
Hakim Satyadi(1*), Agus Kurniawan(2), Fadholi Fadholi(3)
(1) Engineering Division, Pelabuhan Ratu, Indonesia
(2) Engineering Division, Pelabuhan Ratu, Indonesia
(3) 
(*) Corresponding Author
Abstract
Alongside the PLN Transformation Program, digitization has emerged as a crucial foundation that the company continues to develop amidst the disruptions caused by modern technology. This effort aims to establish lean and cost-efficient processes. Therefore, companies ensure sustainability and maintain competitiveness amidst increasingly fierce future competition. To establish lean and cost-efficient processes Currently, performance tests are carried out conventionally by collecting data through trending DCS (Distributed Control System) and processing data using Excel, which is carried out once a month for each unit. From this, the performance test results for each unit are only obtained once a month so that the performance of new units can be seen over a long period. Therefore, a longer period is required to observe the performance of new units. To solve the problem above, a performance test unit process was made with a newer concept, namely by adding digitization in it, namely hybrid performance test execution, abbreviated as Hyper-X, the hope is that from the start data collection and processing can be done quickly so that unit performance conditions can be obtained more quickly. Fast and can be monitored in real time. The results obtained from Hyper-X are in the form of energy power indicators, heat rate losses, and costs as well as analysis and recommendations that can provide operating guidelines so that the unit operates more optimally and efficiently. Hyper-X can reduce the potential loss heat rate by 35 kcal/kwh or equivalence with IDR 141,560,000.00. As for other benefits obtained, it facilitates the identification of areas experiencing heat rate losses determines the follow-up execution steps for repairs and fosters a professional and learner culture to solve problems.
Keywords
Full Text:
PDFReferences
PT PLN Indonesia Power, “Penilaian Kontrak Manajemen”, No. 13.KM/004/IP/2023.
Pusat Sertifikasi, PT PLN Persero, “Laporan Pengujian LKIT/0244/10101514/2021”, Rev.0, 2021, p. 3
The American Society of Mechanical Engineers, “Apendix A To PTC”, Performance Test Code 6A, 2000.
The American Society of Mechanical Engineers, “Performance Test Code on Overall Plant Performance”, Performance Test Code 46, 1996
https://www.aveva.com/en/industries/power-utilities/power- generation/, acessed on February 14th 2023.
American Society of Mechanical Engineers, “Fired Steam Generator”, Performance Test Code 4, 2008.
American Society of Mechanical Engineers, “Steam Turbines”, Performance Test Code 6, 2004.
Commissioning Document for baseline determination (SPERI)
External performance test documents (PLN Pusertif and PT EMI Persero to validate performance test calculation data
EPRI and SP PLN documents for determining turbine and boiler performance tests
DOI: https://doi.org/10.22146/jmdt.102255
Article Metrics
Abstract views : 106 | views : 59Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.